Skip to main content

Sealcoating extends Florida asphalt pavement life by 3-5 years and protects against UV degradation, oxidation, and moisture intrusion. VLJ Construction Services provides sealcoating for commercial properties, government facilities, school districts, and HOA-managed roads across Florida.

When to Sealcoat

  • Asphalt is 1-5 years old (preserve original condition)
  • Surface shows fine cracking but no structural distress
  • Last sealcoat was 3+ years ago
  • Property maintenance cycle (commercial properties typically every 2-4 years)
  • Before hurricane season (June-November) to protect against storm moisture

When Sealcoating Is NOT the Right Call

Sealcoating is preventive maintenance, not structural repair. If the pavement shows alligator cracking across 25%+ of the area, pavement deflection under traffic, or settled/undermined sections, the right answer is mill and resurface — not sealcoat. We give straight assessments on this.

Florida Sealcoating Considerations

Florida UV intensity accelerates asphalt aging. Salt exposure near coastal areas adds chemical wear. We schedule sealcoating during dry-weather windows (24-48 hours minimum after application) and recommend scheduling in late fall through spring for optimal cure conditions.

What We Include

  • Surface preparation and cleaning
  • Crack sealing with hot rubberized asphalt
  • Application of approved sealer product
  • Restriping (paint or thermoplastic, depending on traffic volume)
  • Curing time coordination with property operations

Get a Quote

Property managers, facility directors, and HOAs evaluating sealcoating in Florida can reach us through the Contact page or at (844) 258-7825 for an on-site assessment.